The most recent photos are listed first. See also photomap view.
This listing only shows photos within Wishaw.
Go to the national CycleStreets photo listings for photos beyond.
The Wester Way alongside Phase 4 of the Bishopbriggs Relief Road. The lampposts have been planted in the path rather than alongside it (as has been done on the adjacent road), but other than this, it is built to a reasonable standard, an ... [more]
This is a good example of how a cycleway should start on a main road, rather than the usual dropped kerb, but the cycleway only goes around the roundabout and then is finished. There's not even a connection towards the new college (see #745 ... [more]
The towpath of the Forth & Clyde Canal is now paved all the way to Glasgow, with the exception of a couple of short sections around bridges.
Rebuilt path in Airdrie, that connects with NCN 75. The chicane barriers have been installed since there is a problem with motorbikes being ridden along here, although they are easy enough to get around.